Apartment & Multi-Family Electrical Panel & Main-Service Upgrades

Keep Your Building Powered, Insured & Code-Compliant

Los Angeles’ turnkey solution for replacing Federal Pacific, Zinsco, Sylvania, Challenger & Pushmatic panels and upsizing main services up to 800 A—without leaving tenants in the dark.

One-stop permit, utility & construction
We handle LADWP/SCE applications, LADBS plan-check and cut-over logistics.
Minimize downtime
Smart scheduling limits power‑off to just minutes.
Insurance compliance letter
Written letter of compliance upon completion.

Request a Free 15-Minute Owner Consult

Why Act Now? – Problem Snapshot

Pain Point Impact on Apartment Owners
Insurance non-renewal letters for unsafe panels Average premium hike: +32% or outright denial within 30 days.
1960-80 era infrastructure 65% of LA County’s multifamily stock was built before 1975—panels & feeders are beyond design life.
Electrification demand Heat pumps, EV chargers & solar require 2-4× more service capacity.
Utility & permit bottlenecks LADWP queues >400 A service requests 6-12 weeks; early submission avoids project stalls.

Sources: California Housing Partnership 2024 report; Apartment Owners Assoc. insurer survey 2025.

Identify the Risky Panel Brands

Federal Pacific (Stab-Lok)

  • Breakers often fail to trip; studies show a 25%+ chance of overheating under normal load.
  • Flagged by every major insurer; replacement breakers lack UL listing.

Zinsco / GTE-Sylvania

  • Aluminum bus bars corrode and lose tension, leading to dangerous arcing.
  • Breakers can weld in the ON position, eliminating overload protection.

Sylvania “Zinsco-Type”

  • Same stab-design as Zinsco; typically installed 1973-1978.
  • Labels vary—visual inspection required.

Challenger / Eaton-Challenger

  • Bus stabs overheat when multiple HVAC or appliance loads cycle.
  • Subject of a 1988 CPSC breaker recall; many originals remain in service.

Pushmatic / I-T-E

  • Uses a mechanical trip spring that fatigues over time.
  • Replacement parts discontinued since 1983, making safe repairs impossible.
Maintenance tip: Snap a photo inside the panel—if you see colored breaker handles or scorch marks on the bus, schedule an inspection.

How Our Turnkey Upgrade Process Works

Load Study & Panel Inspection

Load calculation and single line diagram.

Utility Service Application

We file LADWP/SCE Form 480-02 for >400 A or 3-phase requests.

LADBS Plan-Check & Permit Pull

Building & Safety Department permit.

Tenant Notification & Scheduling

Scheduling with landlords & property managers.

Temporary Power & Cut-Over Day

Limited power shut off.

Panel + Meter Bank Replacement

UL-listed switchgear, copper feeders, breakers.

Final Inspection & Insurance Letter

We guarantee to pass electrical inspection.

Typical tenant outage: 8–10 hours

Why Upgrading Pays Off

Avoids Emergency Repairs

Prevents $25K–$60K emergency fire repairs.

Insurance Savings

Premium savings average $1,800–$3,600/yr.

Future-Ready Infrastructure

Positions building for EV charger & solar incentives worth up to $2,000 per unit.

Recent Projects – Case Studies

Huntington Beach | 232 Units | 400 A Switchgear + Sub Panel Replacement

 

West Hollywood | 10 Units | 400 A Service + Sub Panel Replacement

 

Silver Lake | 12 Units | New 400AMP Electrical Service & Sub Panel Replacement

  

Why Branover Contractors?

Licensed & Certified

C-10 Licensed since 1985

Experience

Over 1,200 panel replacements completed since 2003.

Industry Recognition

Featured service provider: Apartment Owners Association of CA.

“Branover’s team swapped our 1968 Zinsco meter bank in one weekend— zero tenant complaints.” – J. Alvarez, 32-Unit Owner, Hollywood

Ready to Secure Your Building?

Book Your Free 15-Minute Owner Consult

📞 (323) 467-6661
✉️ info@branovercontractors.com

Schedule a Consulation

Scroll to Top