Case study · Los Angeles, CA

14-meter service replacement
across two apartment buildings

One owner, two buildings, 12 occupied units, and two aging main services that were past the point of repair. One building was fed overhead, the other underground. We replaced both with new Siemens equipment, new grounding and 14 new sub-panels, with the LADBS permits and LADWP meter sets handled for the owner.

12 occupied unitsOverhead + undergroundLADBS permitsLADWP meter sets
2
Buildings
14
Meters
14
Sub-panels replaced
4
New ground rods
LADWP
Utility coordination
The project

Two old services, one owner, one schedule

The owner has two apartment buildings in Los Angeles with 12 occupied units between them. Each building has seven meters: six apartments and a house meter for common-area power.

Both main services had aged to the point where replacing them made more sense than patching them. The catch was that the two buildings weren’t fed the same way. Building A takes power overhead and Building B underground, so each needed its own utility plan, routing and code checks, while the owner wanted the whole job run as one project.

Owner’s objective

What the owner needed

  • Both main services replaced, all 14 meters
  • Work permitted, inspected and closed out with LADBS and LADWP
  • The same equipment and grounding standard on both buildings
  • Outages kept as short as possible for 12 occupied units
Before

Two buildings, two service types

Overhead and underground services follow different clearance, routing and utility rules. We planned each building as its own service, then ran them on one timeline.

Building A · Overhead

  • ✓ 7 meters (6 apartments + house)
  • ✓ Overhead service drop from LADWP
  • ✓ Clearances checked with LADWP Service Planning
  • ✓ 7 sub-panels replaced
  • ✓ 2 new ground rods, bonded to the cold-water pipe

Building B · Underground

  • ✓ 7 meters (6 apartments + house)
  • ✓ Underground service from LADWP
  • ✓ Underground routing confirmed with LADWP Service Planning
  • ✓ 7 sub-panels replaced
  • ✓ 2 new ground rods, bonded to the cold-water pipe
New Siemens meter center installed on one of two Los Angeles apartment buildings
New Siemens service equipment, [Building A or B].
Completed 7-meter service replacement at a Los Angeles apartment building
Finished service, [Building A or B].
Scope of work

One standard for both buildings

01

Siemens on both services

New Siemens main service equipment on each building, so the owner has matching gear and the same breakers to stock at both addresses.

02

Grounding and bonding

Two new ground rods per building, bonded along with the main cold-water pipe, brought up to current code on both services.

03

All 14 sub-panels replaced

Twelve apartment panels and two house panels, so no old breakers were left feeding off the new services.

04

Each service planned on its own

Separate scope, LADWP review and cut-over plan for the overhead and the underground building, under one schedule.

How the job ran

From walkthrough to close-out

  1. 1Walkthrough and scope. Walked both properties, documented the existing services and set a separate scope for each building.
  2. 2LADWP service planning. Got a meter location approved for each building, checking overhead clearances on Building A and underground routing on Building B.
  3. 3LADBS permits. Pulled electrical permits for both services and scheduled inspections around the cut-over dates.
  4. 4Cut-over, one building at a time. Shut down each building on a planned outage, removed the old service, installed the Siemens equipment and grounding, and replaced the sub-panels.
  5. 5Inspection and meter set. LADBS inspected and finaled both services, and an LADWP crew set and energized all 14 meters.
  6. 6Close-out. Gave the owner updated panel directories, job photos, and the permit and inspection records for both buildings.
The result

Two matching services with clean records

Permits finaled

Both services passed LADBS inspection, and all 14 meters were set by LADWP.

Safer, more reliable power

New service equipment, correct grounding and bonding, and new breakers in every unit.

Planned outages

Each building was shut down on its own schedule, and power came back in stages as panels were energized.

Paperwork on file

Panel directories, photos and inspection records the owner can hand to an insurer, lender or buyer.

More than one building on an old service?

Overhead, underground or one of each, we plan it with LADWP, pull the LADBS permits and leave you with the records. Send photos of the meters and panels and we’ll get you a written price.