Case study · Woodland Hills, CA

200-amp underground service upgrade
& EV charger for a Woodland Hills home

The owners were renovating the whole house and adding an electric vehicle, and their 100-amp service was already maxed out. We replaced it with a new Siemens 200-amp panel on the existing underground feed, brought the grounding up to code and ran a dedicated circuit to a Level 2 charger in the garage. LADBS permit and LADWP meter set included.

Single-family homeUnderground serviceLADBS permitLADWP meter set
100A → 200A
Service capacity
40
Breaker spaces
60A
EV charger circuit
2
New ground rods
LADWP
Utility coordination
The project

A full renovation that outgrew a 100-amp service

The house is a one-story single-family home in Woodland Hills, served by an underground lateral from LADWP. The owners were renovating the entire house and planning new high-demand loads: kitchen appliances, future HVAC and an electric vehicle.

The original 100-amp panel had no room left, the grounding didn’t meet current code, and the service equipment needed replacing to take the new loads. Woodland Hills is in the City of Los Angeles, so the permit ran through LADBS and the meter work through LADWP.

Owner’s objective

What the homeowners needed

  • Enough capacity for the renovation, future HVAC, kitchen appliances and EV charging at home
  • Grounding and bonding that meet current code
  • A Level 2 EV charger in the garage on its own circuit
  • No digging up the yard. The existing underground conductors had to stay in service
Before

The existing electrical system

The house was still running on its original 100-amp meter and main, fed underground from LADWP. It was enough for the house as built, not for the house after the remodel.

  • ✓ 100-amp meter/main with no open spaces
  • ✓ Underground lateral and conduit from LADWP
  • ✓ Grounding that didn’t meet current code
  • ✓ No circuit available for an EV charger
Scope of work

New service, new grounding, new EV circuit

01

New Siemens 200-amp panel

Removed the 100-amp meter/main and installed a Siemens 200-amp, 40-space main-breaker panel rated for the underground feed.

02

Existing underground feed reused

Reconnected the new panel to LADWP’s existing underground conduit and conductors. No trenching, no yard excavation.

03

Grounding and bonding

Drove two 5/8″ × 8′ copper ground rods 6′ apart and bonded a #4 copper grounding electrode conductor to the rods and the main cold-water pipe.

04

60-amp EV charger circuit

Ran #6 copper in 3/4″ EMT to the garage and installed the Level 2 charger on its own dedicated breaker.

05

Permit, inspection and meter set

One LADBS electrical permit covered the panel and the EV circuit. LADWP handled service planning and set the new meter.

Installation

From permit to power back on

  1. 1Assessment. Confirmed the 100-amp service couldn’t carry the new loads, checked utility records for the underground lateral and picked a panel compatible with the existing feed.
  2. 2LADWP service planning. Submitted the service-planning paperwork and got the meter spot approved using the existing lateral conduit.
  3. 3LADBS permit. Pulled one electrical permit covering the service upgrade and the EV branch circuit, and gave the homeowners notice of the shutdown.
  4. 4Installation. De-energized and removed the old meter/main, mounted the Siemens panel, reconnected the underground conductors, installed the grounding and ran the EV circuit.
  5. 5Inspection and meter set. Passed the LADBS inspection, then LADWP set the new meter and energized the service.
The result

Room to grow, and an EV that charges at home

Double the capacity

200 amps and 40 spaces leave headroom for the new kitchen, future HVAC and whatever comes next.

Level 2 EV charging

The garage charger runs on its own 60-amp circuit instead of sharing power with the rest of the house.

Code-compliant grounding

Two new ground rods plus the water-pipe bond, inspected and signed off by LADBS.

No yard excavation

The existing underground conduit and conductors were reused, so there was no trenching across the yard.

Before & after

What changed

BeforeAfter
Service100-amp meter/mainSiemens 200-amp, 40-space main-breaker panel
Utility feedUnderground lateral from LADWPSame lateral, reconnected to the new panel
GroundingNot up to current codeTwo ground rods, #4 copper GEC, water-pipe bond
EV chargingNo circuit availableLevel 2 charger on a dedicated 60-amp circuit
PermitNoneLADBS permit, inspected and finaled

Job photos

The actual job, not stock photos.

Original 100-amp underground service at a Woodland Hills home before the upgrade Electrical service work in progress at a Woodland Hills single-family home New Siemens 200-amp panel installed on the existing underground feed in Woodland Hills Completed 200-amp service upgrade with EV charger circuit, Woodland Hills

What the homeowner said

“We hired Branover when our usual electrician was not available. Michael was wonderful from the start, giving us the bid price that we had turned down and making recommendations that were helpful as well. Branover installed an upgraded electrical panel and an EV hookup in our garage. The work was done fast, accurately and neatly. They then came back to help us with electrical connections for our new dishwasher.

Sorry, former electrician. We are Branover customers from here on out!”

Adding an EV or remodeling on 100 amps?

Send photos of your panel and meter. We’ll tell you whether you need an upgrade and send a written price, usually without a site visit.

Branover Contractors, Inc. — CA C-10 Electrical Contractor License #484143. Family-owned and operated since 1985.

Scroll to Top